Internal network

An electricity network within a defined area, for example a campsite, which under IKN-förordningen does not require a network concession (internt nät in Swedish). IKN-förordningen, Section 16

Last checked 12 October 2026

Pitch 17, one day. Metered at the socket, not at the entrance.

25.5 kWh

pitch 17 over the day, metered at the socket at 21:16

Since arrival
36.3 kWh
Metering point
the socket at the pitch
Belongs to
the booking, not the post

Counted from the demo day at Strandvik, which is an invented campsite. The same figure is shown to the guest in the phone and to the owner in the overview.

Leading electricity on to somebody else is an activity that requires a licence in Sweden. The exemptions in IKN-förordningen (the regulation on exemptions from the requirement for a network concession) are what let a campsite have power out at every pitch without being an electricity network company.

What Section 16 exempts

The ordinance on exemptions from the requirement for a network concession (Förordningen (2007:215) om undantag från kravet på nätkoncession) exempts, in Section 16, internal networks within a sports ground, a campsite, an amusement park or a similar area for leisure activities. The network is to lie within the defined area.

What the exemption does not answer

The exemption concerns the concession, that is the licence. Electrical safety applies as usual and the installation is to be done by somebody with the right authorisation. How the electricity is charged to the guests is a tax question that the regulation does not answer.

The exemption covers
the network concession, not electrical safety
The area
campsite, sports ground, amusement park
Metering point towards the network owner
the campsite's connection
Metering point towards the guest
the socket at the pitch

A fixed charge or per kilowatt hour

Many campsites have put the electricity in the price of the pitch or taken a fixed daily charge. If you meter per pitch instead, the guest pays for what they use: a motorhome with the heating on in October draws more than a tent in July. Which way you choose affects the VAT, and that is a question for your accountant.

The metering in everyday use

At Strandvik, pitch 17 stands at 25.5 kilowatt hours for the day at 21:16, and 36.3 since arrival. The guest sees the same figure in the phone as the owner sees in the overview, and the figure belongs to the booking on the pitch — not to the post. If the guest moves to another pitch, the consumption follows the booking.

Revelius is not an electricity network and makes no assessment of concession. Metering per pitch is a capability in the system. What applies to your network is decided by the regulation, by your network owner and by the electrical installation.

Sources

  • Förordningen (2007:215) om undantag från kravet på nätkoncession, Section 16. Read 12 October 2026.
  • Ellagen (1997:857), the Electricity Act, ch. 2. Read 12 October 2026.

This page is a short explanation with the source given, not legal advice.

Three links out to the socket. One responsibility each, and two metering points.

  • The network ownerfeeds electricity into the campsite's connection
  • The campsite's connectionthe first metering point, towards the network owner
  • The socket at the pitchthe second metering point, towards the guest's booking

The internal network is the link between the connection and the socket: the campsite's own, within the area. Metering per pitch is what makes it possible to charge by consumption instead of guessing with a fixed daily charge.

Questions about the network

What is an internal network?

An electricity network within a defined area, for example a campsite, which under Section 16 of IKN-förordningen does not require a network concession.

Does a campsite need a network concession for the electricity to the pitches?

Internal networks within a campsite are exempt under Section 16 of the regulation on exemptions from the requirement for a network concession. Electrical safety and installation rules apply all the same.

Is it allowed to charge campsite guests per kilowatt hour?

It is common to meter and charge per kilowatt hour. How the charging is treated for tax, the VAT among other things, is a question for your accountant.

What counts as a defined area?

The regulation mentions sports grounds, campsites, amusement parks and similar areas for leisure activities.

The electricity to the pitch. Metered per kilowatt hour, not guessed.

At the mapping we go through the posts, the metering and how the electricity is charged at your place.

Book a call

Revelius is a product of Tavus Sweden AB, Stockholm.